EV Utility Coordination · San Diego County

SDG&E EV Charger Coordination for Electricians and Installers

Installing an EV charger does not always require an SDG&E service project. However, when the proposed charging load affects the property's main panel, meter, electrical-service capacity or utility connection, additional coordination with SDG&E may be necessary.

The ROE Pro helps electricians and EV-charger professionals organize the utility-coordination portion of eligible projects. We coordinate project information, supporting documents, application communication, follow-ups and requested corrections while the licensed contractor remains responsible for the electrical work.

Built for electricians, EV installers and property professionals serving San Diego County.

When EV Charging May Affect the Utility Service

Limited Panel Capacity

The existing panel may not have sufficient capacity for the proposed charging load.

Panel or Service Upgrade

The electrician may determine that a main-panel or electrical-service upgrade is required.

Meter or Utility Connection

The project may affect metering equipment, service conductors or the utility connection.

Start With the Electrical Scope

Does the EV Project Need SDG&E Coordination?

A licensed electrician should evaluate the existing electrical system, available panel capacity and proposed charging load. The electrician determines the technical scope. SDG&E determines whether changes to its service, meter or utility-side facilities are required.

A Straightforward Charger Installation

Some EV chargers can be installed using the existing electrical panel and service. These projects may require a local electrical permit and inspection but may not require an SDG&E service-change request.

A Utility-Coordinated EV Project

SDG&E coordination may be needed when the charger installation requires increased electrical capacity, a main-panel upgrade, a meter change, modified service conductors or another change affecting the utility connection.

The ROE Pro's EV service is intended for projects involving an eligible SDG&E coordination need. We do not replace the electrician's technical evaluation.

EV-Charging Projects We Can Help Coordinate

Residential EV Service Upgrades

Coordination support when a home charging project requires a related panel or electrical-service change.

Commercial Charging Projects

Administrative utility coordination for qualifying charging projects at offices, retail properties and other commercial locations.

Multifamily Charging Projects

Project-information and document coordination when an apartment or condominium charging project affects the utility service.

Fleet and Workplace Charging

Coordination support for qualifying fleet or workplace projects requiring an SDG&E service request or service modification.

Program eligibility, rebates, incentive applications, technical design, equipment selection and installation are not included unless expressly stated in a separate written service agreement.

Prepare the Request

Information an EV Service Project May Need

Requirements vary according to the property, charging equipment, proposed electrical demand, existing service and SDG&E's review.

Project Information

  • Service address and property type
  • Property owner, applicant and contractor contacts
  • Residential, commercial, multifamily or fleet use
  • Number and type of proposed chargers
  • Existing panel and service information
  • Proposed project dates and site conditions

Technical Information from the Contractor

  • Existing and proposed electrical loads
  • Existing and proposed panel amperage
  • Charger ratings and equipment information
  • Meter and service-equipment locations
  • Site plans, single-line diagrams or supporting plans when required
  • Other technical documents requested for the project

The licensed electrician, engineer or qualified design professional remains responsible for load calculations, plans, equipment specifications and technical accuracy.

Utility Coordination Without Adding More Administrative Work

Electricians and EV installers should be able to focus on evaluating, designing and completing the installation. The ROE Pro helps manage the eligible administrative portion of the SDG&E request.

  • Organizes customer, property and project information
  • Coordinates the eligible SDG&E service request
  • Collects supporting documents provided by the responsible parties
  • Tracks application communication and outstanding information
  • Helps organize responses to requested corrections
  • Maintains a clear project record
  • Keeps the contractor and customer informed about administrative needs
Built for Repeat Projects

Coordination Support for Electricians and EV Installers

When EV projects repeatedly require panel or service changes, application administration can consume time that contractors need for estimating, design, scheduling and field work.

The ROE Pro provides a consistent point of coordination for eligible SDG&E requests. Contractors remain responsible for the electrical scope and technical documents, while we help keep project information, utility communication and requested administrative follow-ups organized.

One Point of Coordination

Maintain clear communication between the customer, contractor and eligible utility-request process.

Organized Project Records

Keep the application information and supporting documents associated with the correct project.

Support for Multiple Projects

Electrical contractors and EV installers may use The ROE Pro for separate qualifying customer projects.

Clear Responsibilities Keep EV Projects Moving

Licensed Electrician or Contractor

Evaluates the electrical system, determines capacity, calculates loads, selects equipment, prepares technical documents, performs electrical work and supports local permit and inspection requirements.

SDG&E

Determines utility requirements, reviews the service request, evaluates existing utility capacity and controls utility design, fees, construction, metering, scheduling and energization.

Local City or County

Controls electrical permits, plan review, inspections and code requirements.

The ROE Pro

Coordinates the eligible SDG&E application, project information, supporting documents, communication, follow-ups and requested administrative corrections.

EV Utility Coordination Throughout San Diego County

The ROE Pro provides SDG&E coordination for qualifying EV-charging projects throughout San Diego County when the installation affects the electrical panel, meter, service capacity or utility connection.

Project requirements vary based on the property, electrical scope, charging equipment, local jurisdiction and SDG&E service configuration.

SDG&E EV Charger Coordination Questions

Does every EV charger installation require SDG&E coordination?

No. Some chargers can be installed using the property's existing panel and electrical service. A licensed electrician should evaluate the proposed load and determine the technical scope. SDG&E coordination may be needed when the project changes the panel, meter, service capacity or utility connection.

Who determines whether the panel needs to be upgraded?

The licensed electrician or qualified design professional evaluates the electrical system and proposed load. The ROE Pro does not calculate loads or determine electrical capacity.

Can The ROE Pro install the EV charger?

No. The ROE Pro provides eligible permit and utility-coordination services. Installation and electrical work must be completed by properly licensed professionals.

Can The ROE Pro coordinate the SDG&E service request?

Yes, for qualifying projects within our service scope. We help organize the application information, supporting documents, communication, follow-ups and requested administrative corrections.

Does this service include the local EV-charger permit?

This landing page covers eligible SDG&E coordination. Local electrical permits, inspections and technical plans remain the responsibility of the owner and contractor unless a separate written service agreement states otherwise.

Does The ROE Pro apply for EV rebates?

Rebate and incentive applications are not included in this utility-coordination service unless expressly stated in a separate written agreement.

Can contractors submit multiple EV projects?

Yes. Electricians and EV installers can use The ROE Pro for separate qualifying customer projects requiring utility coordination.

How long will the SDG&E process take?

There is no single timeline for every project. The duration can depend on application completeness, technical review, corrections, utility design, equipment, construction requirements, permits, inspections and scheduling. The ROE Pro does not guarantee an approval, meter-set or energization date.

Related SDG&E Coordination Services

Panel and Service Upgrades

If the EV installation requires increased panel or electrical-service capacity on an existing property.

Explore Panel Upgrade Coordination

New Electrical Service Coordination

For new construction, ADUs, new meters, and temporary construction power that need a new SDG&E service.

Explore New Electrical Service Coordination

Keep the Utility Side of Your EV Project Organized

If an EV-charging installation affects the property's panel, meter or electrical service, The ROE Pro can help coordinate the eligible SDG&E application and administrative follow-up.

Your contractor handles the electrical work. SDG&E controls utility requirements. The ROE Pro organizes the eligible coordination process.

The ROE Pro is an independent permit and utility-coordination service and is not affiliated with, sponsored by or endorsed by San Diego Gas & Electric Company. The ROE Pro does not install EV chargers, perform electrical work, calculate loads, provide engineering or control utility review, design, fees, construction, scheduling, metering or energization. Licensed contractors and design professionals remain responsible for technical work and code compliance. Local agencies control their permits and inspections.